Portfolio

Discover how we collaborate with our clients to shape vision into reality as you explore our portfolio of transformative projects. 

New Allenstown K–8 School | Allenstown, NH

April 17, 2025

Turner Group (TTG) was selected by SAU #53 to lead a comprehensive master planning effort for the Armand R. Dupont Middle School and Allenstown Elementary School. The team began with an in-depth review of existing conditions, engaging closely with school administrators, educators, and community stakeholders to understand the district’s current and long-term needs.

LEARN MORE

Bedford Road over Baboosic Brook – NHDOT #15841 | Merrimack, NH

April 17, 2025

This 90-foot span steel girder bridge on integral abutments replaced a severely undersized and deteriorated CMP. Work included the replacement of a 12-inch water main supported between the girders. Approximately 1100 linear feet of the roadway was reconstructed including elevating the roadway 6.5 feet to mitigate overtopping. This reconstruction included a 300-foot sheet pile retaining wall to accommodate the elevated profile within 25 feet of the existing brook. Traffic control was an on-site single lane detour road and bridge that utilized temporary traffic signals.

LEARN MORE