Expertise: Engineering

Beaver Meadow Golf Course New Clubhouse – Concord, NH

December 18, 2025

The Turner Group has partnered with the City of Concord and Beaver Meadow Golf Course since 2019 to reimagine the future of the Beaver Meadow Clubhouse. Following a facility assessment that identified significant deferred maintenance and renovation issues, TTG teamed with the city in 2023 to investigate the needs of the facility and how the […]

LEARN MORE

Granite Edvance Design Development & New Construction – Concord, NH

October 27, 2025

Granite Edvance, following its recent rebranding, sought to renovate its 7,800 square foot first-floor office to better align with its updated identity and operational needs. The Turner Group was awarded the project to lead the architectural and interior design efforts. The existing layout and finishes no longer supported the company’s vision, prompting a thorough reconfiguration […]

LEARN MORE

NHDOT Maintenance Facilities New Construction – Derry, NH

July 29, 2025

As part of an on-call contract with the New Hampshire Department of Transportation, Turner Group completed a highway maintenance facilities and salt sheds in Derry, NH. In addition to the building design, our team also performed the associated civil and site design work necessary to move the project forward. The new pre-engineered metal building house […]

LEARN MORE

Lindt & Sprungli USA Chiller Plant Design & New Construction – Stratham, NH

July 21, 2025

Following the installation of a new Bindler processing line, Lindt undertook a major facility upgrade with the construction of a new chiller plant to support expanded production needs. The Turner Group provided full architectural and structural engineering services for the project, which included replacing the aging system, coordinating temporary mobile chillers to ensure uninterrupted operations, and designing complex piping connections to rooftop mechanical units—all while maintaining seamless production throughout construction.

LEARN MORE

Glendale Hydroelectric Penstock Rehabilitation – Stockbridge, MA

July 15, 2025

The Glendale Hydroelectric Project, located on the Housatonic River in Stockbridge, Massachusetts, consists of a dam and powerhouse originally built in 1906. It includes a 250-foot-long concrete gravity dam, two manually operated intake gates, and four turbine units with a combined installed capacity of 1.14 MW. The project operates run-of-river, maintaining a 23-acres reservoir and […]

LEARN MORE

The Lodge At White Park New Construction – Concord, NH

July 15, 2025

The Lodge at White Park project consisted of assessing needs, financing, permitting, designing, and construction of a new skate house for White Park located in Concord, NH. Closed over a decade ago due to disrepair, the original 1,600 square foot Skate House was built in the 1950’s sitting on the banks of White Park Pond. […]

LEARN MORE