Portfolio
Discover how we collaborate with our clients to shape vision into reality as you explore our portfolio of transformative projects.
Keene State College / Keene Community Ice Arena – Keene, NH New Locker Room and Facility Renovations
June 23, 2025Turner Group provided architectural services for the interior renovation of the 48,000 sf arena to add university hockey team locker rooms and staff space. TTG worked closely with the client to provide conceptual design services for an interior two-level buildout of a locker room suite within an existing arena. The project involved converting an open […]
Glendale Hydroelectric Penstock Rehabilitation – Stockbridge, MA
July 15, 2025The Glendale Hydroelectric Project, located on the Housatonic River in Stockbridge, Massachusetts, consists of a dam and powerhouse originally built in 1906. It includes a 250-foot-long concrete gravity dam, two manually operated intake gates, and four turbine units with a combined installed capacity of 1.14 MW. The project operates run-of-river, maintaining a 23-acres reservoir and […]
City of Claremont Multiple Dam Inspections and Rehabilitation – Claremont, NH
June 22, 2025Turner Group was retained by the City of Claremont, NH to conduct inspection services for three dams that are integral to the city’s water supply system. These inspections provided the City with critical data to assess the condition of the structures and prioritize necessary repairs and rehabilitation efforts. Following the inspections, TTG developed detailed plans […]
Dartmouth Health Medical Office Building Renovation – Concord, NH
June 19, 2025Turner Group partnered with Dartmouth Health to transform a 13,000-square-foot space into a fully functional clinic, featuring 28 exam rooms, specialty spaces, and team collaboration areas. Our design focused on optimizing layout efficiency, enhancing patient comfort, and upgrading HVAC systems to meet health system standards. The renovation also brought all exterior access points into full ADA compliance—balancing complex spatial constraints with thoughtful, detail-oriented solutions.
Palmer & Sicard, Inc. New Office and Manufacturing Facility – Exeter, NH
March 29, 2025Turner Group provided architectural design and structural engineering services for a new 27,000 square foot headquarters building for Palmer & Sicard, Inc., a mechanical contractor based in Exeter, New Hampshire. The facility includes 8,000 square feet of office space and 19,000 square feet of manufacturing space, thoughtfully designed to support both administrative and operational functions. […]
The Lodge At White Park New Construction – Concord, NH
July 15, 2025The Lodge at White Park project consisted of assessing needs, financing, permitting, designing, and construction of a new skate house for White Park located in Concord, NH. Closed over a decade ago due to disrepair, the original 1,600 square foot Skate House was built in the 1950’s sitting on the banks of White Park Pond. […]