American Ref-Fuel, Inc. Solid Waste Transfer Facility – Lynn, MA
April 24, 2025This project involved the transformation of an existing 340-ton-per-day solid waste transfer station into a modern facility capable of processing 750 tons per day, all while maintaining ongoing operations. The upgrade included a significantly expanded tipping floor, new high-capacity baling and storage systems, improved truck scale infrastructure, and advanced odor, dust, and bird mitigation systems. Site-wide improvements also featured a new stormwater drainage system with an oil/water separator, upgraded electrical systems for continuous operation, and enhanced fire protection and loading capabilities within the redesigned Transfer Building.
Hampton Academy Renovations and Additions – Hampton, NH
June 22, 2025Turner Group was selected to perform a comprehensive site analysis and feasibility study for the expansion of Hampton Academy, a historic school located in a dense urban area with limited available space. Recognizing the site’s constraints, TTG developed and presented four thoughtful design options to the building committee, offering creative solutions for positioning the addition […]
Harold Martin School Renovation & Addition – Hopkinton, NH
July 15, 2025In 2021, Turner Group completed renovations for three schools in the Hopkinton School District within a $9.7 million budget. Maple Street School and Hopkinton Middle/High School received needed interior and systems upgrades, while Harold Martin Elementary School underwent renovations along with a significant addition. Approximately half of the total budget was dedicated to the addition […]
Methuen Construction Headquarters Design Development & New Construction – Plaistow, NH
April 21, 2025Methuen Construction engaged The Turner Group (TTG) to provide architectural and engineering services for the redevelopment of a recently purchased 175,000-square-foot facility on a 37-acre site in Plaistow, NH.
Lindt & Sprungli USA Chiller Plant Design & New Construction – Stratham, NH
July 21, 2025Following the installation of a new Bindler processing line, Lindt undertook a major facility upgrade with the construction of a new chiller plant to support expanded production needs. The Turner Group provided full architectural and structural engineering services for the project, which included replacing the aging system, coordinating temporary mobile chillers to ensure uninterrupted operations, and designing complex piping connections to rooftop mechanical units—all while maintaining seamless production throughout construction.
Pennichuck Water Works Design Development & New Construction – Merrimack, MA
July 24, 2025The Turner Group, Inc. was selected to provide design, project management, and construction oversight for a new office, vehicle warehouse, and distribution facility serving Pennichuck Water Works’ (PWW) Distribution Department. The 47,000-square-foot facility was developed to meet LEED®-equivalent standards, incorporating a range of sustainable and green building initiatives. The building was designed to support PWW’s […]